RESUME
SANDIP KAMLAKAR CHANDWADKAR MOBILE NO. 9890661073
EXPERIENCE
A : Anil Tubes (A Division of Anil Chemicals & Ind. Ltd.) Pharola, Aurangabad, as a Q.A.Officer since 27.3.04
Anil Tubes is a One of the largest manufacturer of multiplayer seamless plastic tubes organization.
* Receipt Raw Material Inspection like Lab testing, visual inspection, Line trial in some cases, clearance of
Material / GRN & keeping records of inspection / trials / test reports.
* In process Inspection – a) First Piece Inspection – Generally carried outs at the time of job change, tool change,
Material change, new job, M/c restart after more than 4 hours. Check Points are visual checks, dimensional checks,
Functional checks, laboratories testing, fitments etc, & keeping the records of First piece inspection report.
b) Inspection of Production - Visual, dimensional, functional , lab testing, fitments & duly passed production by QA
Inspectors is verified by QA Officer (AQL of duly passed production with ref. To customer inspection plan / MIL STD
105 D / IS 2500 (I) & keeping records of AQL reports, in process reports.
* LAB Tests – 1) MFI Test, 2) Barrier Layer Test, 3) Opening Force Test, 4) Seal ability Test, 5) Bursting Test,
6) Sun Exposure Test, 7) Opacity Test.
* To help for proper process control (Master Batch Proportions)
* Preparation of dully Quality Control measure reports & Monthly quality review reports.
Machines – Injection Molding, Compression Molding (Asia), Co-Extruded (Brayer), Printing (Polytype), Hot Foiling.
B : Videocon Appliances Ltd., Washing Machine Div. (ISO-9001), Aurangabad.
As a Q.A.Engineer In Quality Assurance Dept. Plastic Molding Shop, Since June 2002
* To ensure required Quality of Finished Components.
* To maintain JIGS & FIXTURES for production.
* Take care of deflashing & Screen Printing.
* Patrolling for aesthetic & functional requirements as per standard accepted components.
* To coordinate with the Assembly line for the problems if any.
* To control color variation & raw material as per the specification of the product.
* Responsible for proper reporting & recording.
* Responsible for Line Inspection (Patrolling) & Final Inspection.
* Responsible for using specified base material & master batches.
* Preparation of ISO Documentation.
Major Achievements - 1) Rejection % of Mold shop in Assembly shop decreases.
2) Company cost saving Rs. 1200/- per day.
C : Jyoti Structures Ltd., Satpur, Nasik -7.
Material Dept. From May 2001 to April 2002.
* Preparing Material inward note.
* Preparing day-wise receipt note.
* Material sent to quality for inspection.
* Preparing Transaction statement.
* Preparing various monthly reports.
D : Shareen Auto Pvt. Ltd., Nashik
Quality Dept. Dec. 1999 to Jan. 2001
* Checking Diameter, tapping, Key way of Axle of Mahindra & Mahindra.
* Checking Diameter, tapping, thickness of spindle of Mahindra & Mahindra..
* Checking Diameter, height, collar thickness of shafts of TELCO, Pune.
* Checking Bracket holes, Diameter.
* Preparing Inspection Report.
E : M.S.E.B. Nashik Zone, Nashik Road,
Apprenrticeship As a Technician Engineer in E.D.P. Dept.
ACADEMIC QUALIFICATION :- B.SC. (PCM) with 44% , April – 95 from Amravati University.
ADDITIONAL QUALIFICATION :- Advanced diploma in computer software, system, analysis &
application (A.D.C.S.S.A.) 66.91%, 1997 from BTE, Mumbai.
MSOFFICE, FOXPRO, ‘C’ LANGUAGE,
PERSONAL INFORMATION
Father Name :- Late. Kamlakar Baliram Chandwadkar
Permanent Address :- 17, Niraj Society, Near Wadhane Poultry Farm, Mhasrul, Nasik - 4.
PH.NO.(PP)(0253)2593725
Date of Birth :- 10th April 1973
Nationality :- Indian.
Languages Known :- English, Hindi, Marathi.
Email Id :- sandipchandwadkar@rediffmail.com
I hereby declare that above information is correct to the best of my knowledge.
DATE :
PLACE : (CHANDWADKAR S. K.)